CURRENT ACTIVITIES


ERG Company is currently constructing Deriner Dam and Hydroelectric Power Plant in Artvin (northeast of Turkey) awarded by the State Hydraulic Works (DSİ). Deriner Dam is located on the Çoruh River and the type is a double curvature concrete arch dam. The dam will be the highest in Turkey and third highest in the world with a height of 253 meters. The excavations of the dam body, diversion tunnel access roads and internal roads were constructed with approximately 2000 personnel. 85% of the total rock excavation of 30.000.000 m3 has been completed and the concreting of dam body having a total of 3.500.000 m3 of concrete will start soon. The underground power plant having 4x167.5 MW installed capacity will also be constructed in this scope to provide 2.300 GWh of electrical energy annually.


A BRIEF INFORMATION ABOUT DERINER PROJECT CHARACTERISTICS

Location
:
ARTVIN, TURKEY
Scope of the Project
:
Energy (670 MW, 2.117,75 GWh/y)
Type
:
Double Curvature Thin Arch Dam
Crest Length
:
720 m
Height (from foundation)
:
253 m
Crest Width
:
12.00 ~ 18.00 m
Width at the Foundation
:
55 m
Total Concrete Vol. at the Dam Body
:
3,500,000 m3
Diversion Tunnel Length
:
898,14 m
Diversion Tunnel D. (Outer, Inner)
:
14 m, 11.6 m
Diversion Capacity
:
1.804 m3/s
Spillway Types
:
2 Overflow Spillways, 8 Orifice Spillways
Overflow Spillway Capacity
:
2.250 m3/s
Orifice Spillway Capacity
:
7.000 m3/s
Overflow Spillway Tunnel Lengths (I, II)
:
Tunnel I- 420.86m , Tunnel II- 446.60 m
Overflow Spillway Tunnel Diameters
:
8 m



General Layout of Deriner Dam and HPP Construction



Main Office: Çankaya Caddesi No.26 06551 Çankaya-ANKARA-TURKEY
Tel: +90 312 441 50 00 - Fax: +90 312 440 32 62, +90 312 484 15 00

Branch Office: Konya Yolu 23. Km. P.K.10-11 Gölbaşı-ANKARA-TURKEY
Tel: +90 312 484 08 00 (10 Lines) - Fax: +90 312 484 14 36


email : pimakina@pimakina.com.tr