ERG Company is currently constructing Deriner
Dam and Hydroelectric Power Plant in Artvin (northeast of
Turkey) awarded by the State Hydraulic Works (DSİ). Deriner
Dam is located on the Çoruh River and the type is a double
curvature concrete arch dam. The dam will be the highest in
Turkey and third highest in the world with a height of 253
meters. The excavations of the dam body, diversion tunnel
access roads and internal roads were constructed with approximately
2000 personnel. 85% of the total rock excavation of 30.000.000
m3 has been completed and the concreting of dam body having
a total of 3.500.000 m3 of concrete will start soon. The underground
power plant having 4x167.5 MW installed capacity will also
be constructed in this scope to provide 2.300 GWh of electrical
energy annually.
A BRIEF INFORMATION ABOUT DERINER PROJECT CHARACTERISTICS
| Location |
: |
ARTVIN,
TURKEY |
| Scope
of the Project |
: |
Energy
(670 MW, 2.117,75 GWh/y) |
| Type |
: |
Double
Curvature Thin Arch Dam |
| Crest
Length |
: |
720
m |
| Height
(from foundation) |
: |
253
m |
| Crest
Width |
: |
12.00
~ 18.00 m |
| Width
at the Foundation |
: |
55
m |
| Total
Concrete Vol. at the Dam Body |
: |
3,500,000
m3 |
| Diversion
Tunnel Length |
: |
898,14
m |
| Diversion
Tunnel D. (Outer, Inner) |
: |
14
m, 11.6 m |
| Diversion
Capacity |
: |
1.804
m3/s |
| Spillway
Types |
: |
2
Overflow Spillways, 8 Orifice Spillways |
| Overflow
Spillway Capacity |
: |
2.250
m3/s |
| Orifice
Spillway Capacity |
: |
7.000
m3/s |
| Overflow
Spillway Tunnel Lengths (I, II) |
: |
Tunnel
I- 420.86m , Tunnel II- 446.60 m |
| Overflow
Spillway Tunnel Diameters |
: |
8
m |

General Layout of Deriner Dam and HPP Construction
|
|
Main Office: Çankaya Caddesi No.26 06551 Çankaya-ANKARA-TURKEY
Tel: +90 312 441 50 00 - Fax: +90 312 440 32 62,
+90 312 484 15 00
Branch Office: Konya Yolu 23. Km. P.K.10-11 Gölbaşı-ANKARA-TURKEY
Tel: +90 312 484 08 00 (10 Lines) - Fax: +90 312
484 14 36
email : pimakina@pimakina.com.tr
|