| Artvin - Deriner Dam and HEPP |
|
|
|
|
Deriner Dam and Hydroelectric Power Plant is located at Artvin province on Çoruh River and the type is double curvature concrete arch dam. The height of the dam is 253 meters and with this height, the dam is the highest in Turkey and third highest in the world. The scope of Deriner Dam and HEPP construction includes 40.000.000 m3 of rock excavation, 3.500.000 m3 of dam body concrete, diversion tunnel, underground powerhouse, overflow spillways, access roads and internal roads. OWNER State Hydraulic Works (DSİ) - TURKEY CONTRACTOR Deriner Consortium - Under the leadership of ERG PLACE On çoruh river near Artvin province PURPOSE Energy (670 MW, 2.117,75 GWh / year) CHARACTERISTICS Type Double curvature concrete Crest Elevation 397 m Height from thalweg 202 m from foundation 253 m Crest Width 12,00 – 18,00 m Foundation width 55,00 m Body concrete 3.500.000 m3 Diversion tunnel 898,14 m Diversion capacity 1.804 m3/s Spillway type Overflow 2 ea. Orifice 8 ea. Overflow spillway capacity 2.250 m3/s Orifice spillway capacity 7.000 m3/s Maximum water elevation 395 m Total reservoir volume 1.969 x 106 m3 Powerhouse Right bank Type Underground Number of units 4 Installed capacity 4 x 167,5 MW (670 MW) Total energy 2.117,75 GWh
PLANT Steel and Formwork Workshop 10.000 m2 Machine Workshop 30.000 m2 Crushing and Screening Plant 5 ea. Concrete Plant 5 ea. Cable Crane 3 x 30 ton MACHINERY Bulldozer 20 ea. Loader 15 ea. Excavator 20 ea. Grader 7 ea. Roller 5 ea. Truck-mixer 20 ea. Concrete Pump 9 ea. Concrete Truck 4 x 30 ton Drilling Machinery 15 ea. Truck 50 ea. Rock Truck 10 ea. Trailer 7 ea. Fuel Tanker 8 ea. Mobile Crane 14 ea. Truck Mounted Crane 10 ea. Pick-up 25 ea. Pickup Truck 25 ea. Tractor 10 ea. Bus 10 ea. Minibus 5 ea. Jeep 10 ea. Car 20 ea. Cement Trailer 30 ea. Injection Machines 15 ea. Various Machinery 16 ea. EQUIPMENT Concrete Mixer 3 ea. Generator 22 ea. Transformer 25 ea. Water and Injection Pump 80 ea. Workshop Equipment 30 ea. Welding Machines 60 ea. Steel Cut Bend Machines 8 ea. Concrete Vibrators 35 ea. Compressors 15 ea. Electric Compressor 25 ea. Formwork Systems 10.000 m2
DAM EXCAVATION:
DAM BODY DIVERSION: ANCHORAGE
RIVER DREDGING
ROADS: UNDERGROUND POWERHOUSE: ELECTROMECHANICS:
COFFERDAMS
TUNNELS
POWERHOUSE
CRUSHING, SCREENING and WASHING PLANT 1000 ton/h
AGGREGATE STORAGE 10.417 m3 ICE & CHILLED WATER PLANT CONCRETE BATCHING PLANT 360 m3/h CEMENT STORAGE 4 x 2.300 ton
CABLE CRANE
|