Airport
Antalya Airport PDF Print E-mail

 

The main features of successfully completed Antalya Airport construction is as follows:

1. The Owner Ministry of Public Works, General Directorate for Construction of Airports and Oil Supply Facilities
2. Date of bid award 23 January, 1973
3. Date of completion 15 May, 1977
4. Main work items  
  a. Runway 3.400 m x 45 m x 0,40 m
  b. Apron 450 m x 225 m x 0,40 m
  c. Taxi route no. I 168 m x 22,5 m x 0,40 m
  d. Taxi route no. II 281,5 m x 22,5 m x 0,40 m
  e. Taxi route no. III 68 m x 22,5 m x 0,40 m
  f. Access and service Roads approx. 50 km
5. Quantities of main works performed:
  a. Total earth moving 1.500.000 m2
  b. Total concrete works 300.000 m2
  c. Cement used 50.000 ton
  d. Fencing approx. 10 km

 

 


 
 

 

 

 
Atatürk (Yeşilköy) Airport PDF Print E-mail


Brief informations concerning the Istanbul-Atatürk Airport (former name Yeşilköy) construction:

1. The Owner Ministry of Public Works, General Directorate for Construction of Airports and Oil Supply Facilities

2. Date of bid award

19 January, 1977

3. Date of completion

15 June, 1980

4. Main work items

 

 

a. Runway

2.300mx 60m x0,35 m

 

b. Cargo apron

150 m x 100 m x 0,35 m

 

c. Taxiways and connections

1.500 m x 22,50 m x 0,35 m

 

d. Ducts for electric cables

10.000 m

 

e. Drainage system

The whole area

5. Quantities of main works:

 

a. Total earth moving

1.000.000 m3

 

b. Total concrete works

235.000 m2

 

c. Asphalt pavement

9.850 ton 

 

d. Cement used

30.000 ton

 

e. Lean concrete

24.500 m3

 

The project involved 2,50 m selected borrow fill, 90 cm thick crushed stone as sub-base and base material and 35 cm of Concrete pavement. Quarry materials were brought form quarries 25 km far to site and crushed at size through a crushing plant, designed and manufactured by ERG. A 100 m3/h capacity batching and mixing plant, also manufacture of ERG, was used for concrete works. Aggregate for concrete was produced through the crushing-screening and washing plants, manufactured by ERG, and sea sand was used. Similar earth moving machinery and equipment, spreader-finisher, joint cutters and joint fillers used at Antalya Airport were also utilized at Yeşilköy.

 


 
 

 

 

 
Kars Airport PDF Print E-mail

 

Brief informations concerning the construction of Kars Airport and infrastructural works:

1. The Owner Ministry of Public Works, General Directorate for Construction of Airports and Oil Supply Facilities
2. Date of bid award 10 February, 1977
3. Date of completion 6 September, 1981
4. Annual working period 4.5 months

5. Main work items:

 

 

a. Runway 

3.500 m x 45 m x 0,35 m

 

b. Apron

130 m x 76 m x 0,35 m

 

c. Service roads

15 km

 

d. Ducts for electrical cables

10.000 m

 

e. Drainage system

approx. 10 km

6. Quantities of main works:

 

a. Excavation

1.000.000 m3

 

b. Embankment

355.000 m3

 

c. Total concrete works

175.000 m2

 

d. Cement used

30.000 ton